Sorry I found no matches, Please try again. 176
vid = 3199pws_id = 0pws_id = 0 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.221.41.214 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

East Anglia Three Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with East Anglia Three Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

East Anglia Three Wind Farm (Wind , Agreed/Planning)

 General Information.

Location in the UK : England, Lowestoft    
Type of installation: Wind    on/offshore: off
Turbines :120  Capacity : 1200 MW
Approx Date of 1st power generation:

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The proposed project would consist of between 100 and 172 wind turbines, with a total installed capacity of up to 1,200 megawatts (MW). The wind turbines would have a maximum tip height of 247 metres (m) above lowest astronomical tide.

East Anglia Offshore Windfarm Limited is a joint venture between Vattenfall and ScottishPower Renewables (SPR) created for the development of Zone 5 of the Crown Estate's Round Three Process.
In June 2019 BEIS approved a non-material change to increase the overall capacity of the windfarm to 1400 MW.
Operated by Iberdrola — through its UK subsidiary, ScottishPower Renewables — the construction of the East Anglia Hub will probably start in 2023 and finish in 2026.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

 Associated Companies.

Relationship Company (For: East Anglia Three )
DeveloperScottish Power Renewables
DeveloperVattenfall

 DECC Data on this Project: East Anglia Three :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: East Anglia 3 (EA 3)     1400 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: The Planning Inspectorate - National Infrastructure
Site ID and Reference: 2470 / B0585     District:
Applicant: Scottish Power Renewables     Application : EN010056 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 100 Turbine Capacity: 14
Height of Turbines: 282 Calculated capacity: 1400
Site Address: East Anglia Offshore Wind Three, Underground Cabling Between Bramford And Bawdsey, Lowestoft
  NR32
County: Offshore Region: Offshore
OS Coordinates: 685500 / 685500
Development Status: Under Construction
Application Submitted: 11/18/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2022    
Generator Live This Record Last Updated: 9/15/2022
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: East Anglia Three: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: start: Optimum: / Stop: / wind: / ratio 0

Project Info
East Anglia Hub Offshore Wind Complex
three projects capable of delivering a total installed capacity of 3,100MW: East Anglia ONE North, East Anglia TWO and EAST ANGLIA THREE.

East Anglia Hub Offshore Wind Complex (EA1 North, EA2, EA3)
This offshore wind farm complex will see the development of three projects capable of delivering a total installed capacity of 3,100MW: East Anglia ONE North, East Anglia TWO and EAST ANGLIA THREE.

EAST ANGLIA THREE BACKGROUND
The EAST ANGLIA THREE project is the second project to be developed in the East Anglia Zone, and is wholly owned by ScottishPower Renewables.

EAST ANGLIA THREE
EAST ANGLIA THREE is the second project ScottishPower Renewables is developing in the East Anglia Zone. Consent for the project was received on 7th August 2017.

About EAST ANGLIA THREE

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School